Carry On House Inspection Process After VP
After the house VP process, the house owner has received the key and has full right to carry on house inspection process. Hence, it is important to check and inspect the house in order to detect the defects or hidden problem after the VP procedure. Thus, the house owner can identify the defects and report all the house problem to the developer. At the same time, the house owner should request or demand the developer to carry on house repairing process to fix the defects and problems.
Common House Defects
After the VP process, the defects which can be commonly found in the new house are as below:
- Paint layer defect
- Wall crack
- Big wall leaning angle
- Windows and doors installation defect
- Dent on the windows or doors frame
- Piping leakage problem
- Electrical port function failure
- Tiles with uneven adhesive layer
- Bad tiles alignment
On the other hand, the house which has kitchen cabinet and air-conditioning device may have installation problem. Nevertheless, the kitchen cabinet may have some defects such as scratch, loose screw and bad panels alignments. While the air-conditioning device may have installation error issue or gas leakage problem. Hence, the house inspection process should have the goal to detect the common defects and house problem which are mentioned as above.
Fix The Defect During DLP Period
If the house inspection report has stated the record about the defects, the house owner should ask the developer to fix the problem. In other words, the house owner has the right to demand the developer to solve all the problem and repair the defects. As a reference info, the housing law in Malaysia is protecting the house buyer right if the developer has done the error and cause the house defects. As a result, the house owner does not need to bear heavy burden and cost to repair the house during the DLP period.
What is Developer Liability Period (DLP)?
The developer liability period can be understood as a warranty cover period after the new house VP. Hence, the developer should play their role to repair the defects and solve the house problems. Generally, the developer has the responsibility to fix the issue if their constructor and builder have done the error and cause the house defects.
As a reference info, common DLP period in Malaysia is 24 months which is 2 years after the VP of the new house. Hence, the house owner has the right to ask the developer to fix and repair the defects as long as the causes are due to the developer errors.
How To Inspect And Check The New House?
Commonly, the house owner can carry on the house inspection tasks by themselves. On the other hand, the house owner can also hire a professional house inspection specialist in KL or Selangor to do the tasks.
As a reference info, the house owner does not require to obtain a permission from the developer to inspect the house. This is because the house owner has the right to access their own house and start the checking process as long as the process does not create loud noise.
House Inspection Specialist In KL And Selangor
The house inspection specialist in KL and Selangor area is offering several solution to check different section of the house. In other words, the house inspection team has the effective solution to inspect and check their client house. Furthermore, there are advance tools for the house inspection team to carry on their tasks and come out with better outcome.
Review The House Inspection Report And Take Further Action
When the house inspection process is on-going, the inspection specialist will record the data, info, video and photo. Hence, the specialist will refer the collected data in order to prepare the house inspection report for the house owner. Thus, the house owner can review and refer the report and plan for the next action if found any house defects.